The bill of materials (BOM) is a structured list of all the components needed to manufacture a finished item. It's the reference document that links your inventory, costs, and production.


































As long as the composition of a product lives in the mind of the workshop, the cost price is an estimate and the stock is an approximation.
The unit is also necessary, and the loss when there is one. A cutting offcut or varnish evaporation that is not declared causes the theoretical stock to drift week after week, without anyone understanding where the discrepancy comes from.
The finished product enters, the components leave. If these two movements are not recorded together, the component inventory remains artificially high and the company places orders too late.
This is the question we ask ourselves when faced with an order. Without a bill of materials, we have to check each component manually. With one, the most critical component directly provides the answer.
It determines what can be sold, what needs to be bought, and what the product actually costs.
A product bill of materials (BOM) is a comprehensive and ordered list of all the components, raw materials, sub-assemblies, and supplies used in the manufacture of a finished product. It indicates not only which items are needed, but also in what quantity, in what unit, and with what tolerance for loss.
In practical terms, if you're making a piece of furniture, your bill of materials lists the boards, screws, hinges, glue, legs, and specifies for each component the exact quantity needed to produce one unit. If you're assembling an electronic product, it details each circuit board, each cable, each enclosure.
The bill of materials is distinct from the manufacturing process. The process describes the production steps (which operations to perform, in what order, on which machine). The bill of materials, on the other hand, answers only one question: what is this product made of?
This document is used by several departments: production to know what to take out of stock, purchasing to anticipate supplies, accounting to calculate costs, and the quality department to trace components in case of a problem with a delivered product.
The bill of materials (BOM) is the starting point for calculating a product's cost price. By associating each component with its unit purchase cost, you obtain the total material cost of one unit manufactured. Let's take a hypothetical example: if your product contains 3 components at €2 each, 1 component at €5, and 0,5 kg of raw material at €4/kg, the material cost comes to €13. Add labor and overhead costs, and you have your complete cost price. Without an up-to-date BOM, this calculation relies on estimates that quickly diverge from reality, especially when supplier prices change.
Before launching a production order, it is essential to verify that all components are available in sufficient quantities. The bill of materials (BOM) allows for this feasibility check: for each listed component, the system compares the required quantity (quantity per unit multiplied by the number of units to be produced) with the available stock. If a component is missing, the production order cannot be launched or must be adjusted. This verification prevents production from being halted mid-production due to the absence of an unforeseen component.
When a production order is launched, the components listed in the bill of materials (BOM) are automatically deducted from inventory. If you produce 10 units and your BOM specifies 3 screws per unit, 30 screws are removed from component stock and the finished product is added to inventory. This automatic deduction ensures that your inventory level remains accurate without manual entry for each production run. This is one of the most direct operational benefits of a well-configured BOM.
If a defect is found in a product delivered to a customer, it is often necessary to identify which batch of components was used during manufacturing. The bill of materials, cross-referenced with the manufacturing order history, makes it possible to trace a specific component back to its supplier. This traceability is particularly useful in the food, medical, and industrial sectors where product recalls may be required. It also provides valuable evidence during quality audits.
Each component in a bill of materials (BOM) occupies a line. Here is the information that a BOM line must contain to be usable:
| Champ | Description | Example |
|---|---|---|
| Component | Reference and description of the item being manufactured | M4-16 screw / M4x16 stainless steel screw |
| Quantity | Number of units of the component needed to manufacture one unit of the finished product | 4 |
| Unit | Unit of measurement in which the quantity is expressed | Piece, kg, liter, meter... |
| Potential loss | Percentage of material lost during manufacturing (scrap, evaporation, normal waste) | 5% (actual quantity consumed = 4,2) |
| Unit cost | Purchase or cost price of the component, used for calculating the material cost | 0,08 € / piece |
The "potential loss" field is often overlooked by very small and small businesses starting out with a bill of materials. However, it has a direct impact on inventory accuracy: if you consistently consume 5% more material than planned without declaring it in the bill of materials, your theoretical inventory will gradually diverge from your actual inventory.
A single-level bill of materials (BOM) directly lists all the components that go into the finished product, without distinguishing between sub-assemblies. It is the simplest and quickest form to implement. It is suitable for simple products composed only of raw materials and purchased parts.
Fictional example of a single-level bill of materials for an assembled product:
A multilevel bill of materials (BOM) introduces subassemblies. A subassembly is itself a manufactured item, which has its own BOM. The finished product contains subassemblies, and each subassembly contains components. This hierarchical structure accurately reflects the reality of manufacturing when certain elements are produced in-house before being assembled into the final product.
Let's return to the previous hypothetical example. If the electronic board is manufactured in-house from purchased components, it becomes a sub-assembly with its own bill of materials:
The multi-level nomenclature is more complex to maintain, but it allows for more precise cost calculation, better management of semi-finished goods stocks and finer traceability.
When a manufacturing order is launched, three stock movements occur in sequence.
First, the components listed in the bill of materials are reserved or removed from stock. The quantity consumed is calculated by multiplying the unit quantity in the bill of materials (including any potential loss) by the number of units to be produced. These components are then removed from the raw materials or purchased components inventory.
Secondly, if manufacturing involves sub-assemblies, these are produced and temporarily placed in semi-finished stock before being consumed in turn for final assembly.
Finally, upon completion of the production order, the finished product is added to the finished goods inventory for the quantity actually produced. If any consumption discrepancies have been observed (components consumed more or less than expected), they must be recorded to maintain inventory consistency.
This mechanism assumes that the bill of materials is accurate. An incorrect quantity in the bill of materials immediately results in a stock discrepancy that accumulates with each production run and eventually renders the theoretical inventory unusable.
Components evolve: a supplier changes a part number, a material is substituted for cost or availability reasons, a formula is adjusted. Each such change must be reflected in the bill of materials before the next production order, not after.
Here are the situations that should trigger a nomenclature update:
A good practice is to version bills of materials (BOMs): each version has an expiry date and replaces the previous one from a defined date. This makes it possible to know which version of the BOM was active when a production order was placed, which is essential for traceability and for analyzing cost variances.
Companies that manage their bills of materials (BOMs) in a spreadsheet quickly encounter versioning difficulties: files multiply, versions become confused, and no one is certain they are working on the correct one. A dedicated management tool centralizes this information and ensures that a single repository is used by everyone.
A bill of materials system that doesn't account for manufacturing losses (cutting scraps, evaporation, normal process rejects) underestimates actual material consumption. With each production run, the theoretical stock level deviates from the physical stock. After a few weeks, inventory counts reveal unexplained discrepancies, and confidence in the stock data collapses.
Using a bill of materials that no longer reflects the reality of the current product is one of the most costly sources of error. Cost calculations are inaccurate, component requirements are poorly estimated, and inventory deductions are based on part numbers that no longer correspond to what has actually been consumed.
The bill of materials (BOM) must always express the quantity of components needed to manufacture one unit of the finished product, not the total quantity for a given batch. If you enter the quantity for a batch of 100, your BOM will be incorrect for any other production volume.
Treating an internally manufactured subassembly as a purchased component prevents the system from correctly calculating the requirements for basic components. The cost price is also distorted, because the cost of the manufactured subassembly is not limited to its purchase price: it includes the material and manufacturing time.
Modifying a bill of materials (BOM) without recording the date and nature of the change makes any retrospective analysis impossible. If a quality issue arises with products delivered three months ago, you will not be able to determine which version of the BOM was active at that time, nor which components were used.
When two products share common components or identical subassemblies, some companies create entirely separate bills of materials (BOMs). If the common component changes, each affected BOM must be updated. A single oversight can create inconsistencies. The best approach is to reference the same subassembly in multiple BOMs, so that a single change is reflected everywhere.
Create a free account and submit your first bill of materials.